New production and storage facility BASF Schwarzheide

Client: BASF Schwarzheide GmbH
Project: New production and storage facility
Dimensions/tonnage: 60m x 80m / 168 t
Realization: 2014/06 - 2015/02
Scope: Hartung GmbH is general contractor, turnkey production hall with statics, detailed design and execution of excavation, foundation, steel construction with trusses, heating, ventilation, plumbing, AC, electrical, telecommunications, and data technology. Fire wall with fire doors, sandwich panel façade, membrane roof on supporting shell, wall strip lighting, windows, doors, gates partially with truck loading station, one and two storey built-in office, technical, and break rooms, staircases inside and out, detached compressor station, 2 pipe bridges.
Special detail: Double-aisled hall, with 30 m clearance trusses, separated by reinforced concrete fire wall