Pipe bridge at SWT Steelworks Thüringen

Client: Stahlwerk Thüringen
Project: Rehabilitation of craneway in hall 2; 3rd job rehabilitation of pipeline
Dimensions/tonnage: 103.5 m x 3.04m x 3.2m top edge of basement ceiling Pipe bridge +14.495 m / 135 tonnes
Realization: 2014, 02 – 11
Scope: creating shop drawings, fabrication, supply and installation of steel structure
Special detail: assembly during production in tight quarters