Production site for C + S Chlorgas

Client: C + S Chlorgas GmbH, Künzing
Realisierung: 2010
Scope of work: Construction of production site with production and bottling hall as well as office and social halls in Chemiepark Bitterfeld: Supply and assembly of two pent roof system halls, roof and wall panelling with sandwich panels; massive walls, ceilings and stairs in the social building, building shell, window, doors, gates, installation and extension, outside facilities
Dimensions/Tonnage: 28.8 x 14.2 x 7.6m and 22 x 14.6 x 7.6m / 21t
Peculiarities: Pre-planning, approval planning, industrial floor heating in the bottling hall, underfloor heating and roof cooling in the office and social building; aerated concrete firewall between the two pent roof halls